Wednesday, 19 July 2017

Understanding VMware - Calculating headroom in VM's (9 of 10)

So as I mentioned before the question I get asked the most when discussing VMware capacity is “How many more VMs can I fit in this cluster?”

Which is similar to asking how many balls used for a variety of sports, does it take to fill an Olympic swimming pool? Unfortunately “It depends” is not an acceptable answer for a CIO. 

The business wants a number, so as a business focused IT department an answer must be given. The key is that it’s ok to estimate. Anybody who’s compared the average business forecast to what eventually happens in reality, knows the business is ok with estimates.

So how do we figure out the number to tell the business.
If we calculate the size of our average VM, and the size of the cluster, then divide one by the other and that’s the total number of VMs, now just take off the current number of VMs right?

Sounds simple. Except we need to define what’s the size of our cluster. Are we allowing for one or more hosts to fail? Can we identify the size of largest host(s)?

We also need to decide what metrics we are going to size on. Do you want to size on vCPUs to Core ratio, or MHz CPU and MB Memory, or some other limitation?

Can you then calculate what your average VM is at every point during the day and pick the peak or a percentile?

Would you decide to agree on an average size for Small, Medium, and Large VMs, then calculate the number of each currently and extrapolate with the existing ratios?

You have to be able to answer these questions before you can start to do the calculations.

Clearly you need data to work with for this. You can manually read info out of vSphere client, and note it down. But I’d suggest you find a tool to automate the data collection.

You’ll need to review the data and make sure it’s a good period to be using for the exercise.

E.g. not during windows updates and a reboot of every VM!

You should also try to include the known projects. You  might have 1000 VMs currently, but  if there are 250 planned for implementation in the next 6 months you’ll want to take them into account.


Here’s an example of a good peak (circled).



The actual peak is a blip that we don’t want to size on. But the circled peak is a nice clean example, that’s in line with other days.



Given the size of the cluster in MB Memory and MHz CPU, the number of current VMs, the size of an average VM, and the size of the largest host I put together a spreadsheet.

There’s a calculation that takes the size of the largest host off the size of the cluster, then calculates 90% of the result. Then calculates the number of average VMs that will fit, and the space available in average VMs for both Memory and CPU. The smallest of the values is then displayed along with either Memory or CPU as the “Bound By” metric.

Conditional formatting on a cell displaying the number of VMs available sets a Red, Amber, Green status.


By including a sheet that can contain the number of VMs needed for future projects, then I calculated a second value including them.



Exporting some of the values I calculated on a regular basis, enables me to then trend over time, the number of VMs that are available in the cluster. Still taking into account the largest host failing, and 90% of the remaining capacity being the max.

In this case, activity was actually falling overtime, and as such the number of VMs available in the cluster was increasing in terms of CPU capacity.

On Friday I'll do a Round-Up of my series and hope to see some of you at my webinar today.

Phil Bell
Consultant




Monday, 17 July 2017

Understanding VMware Capacity - Cluster Memory ( 8 of 10)

Today we'll look at measuring memory capacity in the cluster, just a reminder that in Friday's blog  we discussed where ballooning is persistent (rather than an occasional spike), and that changes should be made in order to ensure there is enough RAM available for the VMs in the cluster.



I explained that b
allooning itself has an overhead on the hypervisor and as such there is the potential to impact performance for the host. Changes don’t necessarily have to be more RAM installed. The very first thing to consider is if any VMs have been created and “forgotten” about.
If we look the cluster as a whole we can see a significant event at the same time the previous VM saw the balloon inflate in memory.


Shared memory plummets, this causes an increase in the demand on memory and, in turn this causes the balloon driver (memory control), to consume more memory, and the swapped memory to increase.
Then, shared memory slowly recovers. The process to identify shares pages only checks a set number of pages each interval. So it takes a while to identify all the shared pages and free up the space taken by duplicates. 

What caused the shared memory to drop so much? Windows updates and a reboot. When a VM starts every page is unique until a duplicate is identified, which takes a short while.

The question we tend to be asked is: How can we model what will happen to our VMware clusters? Typically the underlying questions are more like:

When do I need to buy more hosts?  As in: I need to figure out my budget for the next 12 months, and I’ve no idea if there needs to be any money set aside for hardware purchases.
Will planned projects fit?  I know we have new things planned but I don’t know if they are going to impact our forecasts for the hardware we may need.

How many more VMs can we provision?  I’m used to talking about rack space and space in the datacenter, so give me something I can understand to determine how much space is left.